The Construction Corner – Aug. 27, 2021 Post date August 27, 2021 ConstructionCorner-8-27-2021Download This issue includes: A sneak peak at the view from the top floor of the Hawthorne,A guide to what construction is doing at PVN from Monday, August 30 to Friday, September 3,And progress pictures of the construction in the Corrigan building! ← Older Posts Newer Posts →